INSTALLING WIRING FOR MEASUREMENT AND CONTROL
or

HOW TO (NOT TO) BUILD A LOT OF

Obscure Problems!

  Puzzlement
Frustration
Moan-Sob!

AVOID COMMON RETURNS!!!

Shun!
Don't Use!
Eschew!

IF IT ALL BALANCES OUT, NO PROBLEM -- IF UNBALANCED, WOE!

I1 = I2 V1 = V2 V3 = V4 etc. EVERYTHING BALANCES; NO NOISE OR MEASUREMENT ERRORS.


PLACING WIRES IN WIRE WAYS AND ON POLES REQUIRES SPECIAL SPACING

BE CAREFUL TO USE WIRE THAT IS BIG ENOUGH FOR THE LOAD YOU PLAN TO CONNECT. THEN TEST TO SEE THAT THE CORRECT VOLTAGE APPEARS AT THE LOAD.

VS = VC+VC+VL     VC IS THE LOSS IN THE CONDUCTOR.
IT IS EQUAL TO THE RESISTANCE OF THE CONDUCTORS
TIMES THE CURRENT THROUGH THEM.

IF YOU HAVE A RELAY THAT IS PICKED BY 100 MA, THE LOOP SUPPLY IS 24V, AND THE LINE RESISTANCE IS 20 OHMS, THE VOLTAGE ACROSS THE RELAY SHOULD BE:
VL = VS - VC-VC
22 = 24 - 2
    VC = (RC + RC) I
2V = 20 OHMS x 0.1 AMP

SEE YOUR NATIONAL ELECTRIC CODE HANDBOOK FOR WIRE SIZING.


IF YOU WANT TO TEST NO SNEAK CIRCUITS -- TEST IS EASY.

ANOTHER THING --

LOOSE CONNECTIONS, BAD CONNECTIONS, INTERMITTENT CONNECTIONS, CORRODED CONNECTIONS, LOOSE SWAGE CONNECTORS, COLD SOLDER JOINTS --

  • TOUGH TO FIND
  • WASTE TIME
  • CREATE CONFUSION